Contents
User introduction
General description and technical characteristics
-
Purpose and scope
-
Rating plates and serial numbers
-
Brief information about the device of the power facility
-
Basic technical data
Security requirements
-
Plates (applications) with warning and prohibition signs and notices
-
Safety instructions
-
Intended use
-
Safety rules for unloading from a railway platform
-
General safety instructions
-
Safety requirements when driving
-
Safety rules for adjustments or repairs under the header
-
Safety precautions when using the header cart
-
Fire safety rules
Controls and devices
-
Workplace
-
Governing bodies
-
Steering column
-
Parking brake control
-
Control panel
-
Fuel management
-
Energy vehicle motion control
-
Information panel and control panel
-
Main parameters and characteristics (properties)
-
Terms of use
-
Design and operation
-
Description of additional technological functions
-
Additional technological function MC
-
Launcher
-
Lighting and signaling devices
-
Microclimate devices
-
Electrical fuse blocks
Additional assembly, commissioning and running-in on site
-
General provisions
-
Power assembly
-
General pre-assembly instructions
-
Installing mirror brackets
-
Air conditioner installation
-
Installing dismantled engine parts
-
Installation of hydraulic equipment
-
Installing a fire extinguisher
-
Brake performance test
-
Hitching adapters
-
Mounting the header
-
Running in
-
Check before running
-
Mechanical opening of the normally closed parking brake
Operation and regulation rules
-
Transportation and towing rules
-
Transportation by rail
-
Transportation to the farm
-
Moving a power unit with a header
-
Instructions for towing a power unit in economic conditions
-
Workplace operation
-
Operating the motor unit
-
Engine fuel supply system
-
Engine air supply system
-
Exhaust system
-
Cooling system
-
Power take-off from the engine
-
Running undercarriage
-
Steering axle
-
Operating the hydraulic system
-
Steering hydraulic system
-
Hydraulic equipment of driving wheels
-
Replacing filter elements
-
Replacing the hydraulic oil in the power plant
-
Filling the hydraulic system and hydraulic equipment of driving wheels (GST)
-
Bleeding the header lift cylinders
-
Removing air from hydraulic cylinders for changing the angle of attack of the header
-
List of filters and filter elements
-
Setting the header lowering speed and changing the angle of attack
-
Electrical system operation
-
Batteries
-
Power switch
-
Generator
-
Bearing support operation
Maintenance
-
General information
-
List and recommended order of performance of work for each type of maintenance of the power facility
-
Transportation maintenance
-
Maintenance during operational break-in
-
Shift maintenance (ETO)
-
First maintenance (TO-1)
-
Second maintenance (TO-2)
-
Energy storage maintenance
-
Technical requirements for the main nodes and systems
-
Tightening torques for screw connections
-
Energy lubrication
Storage rules
-
General instructions
-
Preparing energy equipment for storage
-
Storage of a power tool and its components
-
Tire storage
-
Engine storage
-
Hydraulic equipment storage
-
Removal from storage
Possible malfunctions and methods of their elimination
Applications
-
Appendix A List of spare parts, tools and accessories
-
Appendix B Hydraulic schematic diagram
-
Appendix B Electrical schematic diagram
-
Appendix D Belt drives
-
Appendix E Operation of bearing arrangements
-
Appendix E Volumes of refueling tanks